In the Iowa Supreme Court
No. 24–1813
Submitted December 17, 2025—Filed April 24, 2026
Worthwhile Wind LLC,
Appellee,
vs.
Worth County Board of Supervisors,
Appellant.
Appeal from the Iowa District Court for Worth County, Colleen Weiland,
judge.
A county passed a moratorium and later an ordinance regulating wind
energy development within its borders, and the county now appeals the district
court’s decision to allow a wind energy developer to continue its project under
preexisting law. Reversed and Case Remanded.
McDonald, J., delivered the opinion of the court, in which all justices
joined except McDermott, J., who filed a dissenting opinion.
Eric M. Updegraff (argued) of Hopkins & Huebner, P.C., Des Moines, for
appellant.
Bret A. Dublinske (argued), Brant M. Leonard, Nicci Ledbetter, Kelcy
Whitaker, and Kristy Dahl Rogers (until withdrawal), of Fredrikson & Bryon, P.A.,
Des Moines, for appellee.
2
McDonald, Justice.
A wind energy developer devoted several years and expended millions of
dollars planning a commercial wind turbine project in Worth County, but the
developer never applied for or obtained a permit to construct the project. When
the county adopted a resolution imposing a moratorium on further wind projects
and then an ordinance regulating commercial wind turbines, the developer filed
this suit. The developer claimed the moratorium and the new ordinance
effectively precluded it from developing the project. The developer contended that
it acquired vested rights in the prior zoning regime and that the county enacted
the ordinance in bad faith. The district court agreed with both contentions and
held that the developer could complete development of its wind energy system in
accord with the law as it existed before the resolution and new ordinance were
passed. For the reasons explained below, we reverse.
I.
Worthwhile Wind LLC is an affiliate of Invenergy, LLC, a Chicago-based
renewable energy development company. Beginning in 2018, Worthwhile
undertook efforts to develop a commercial wind energy conversion system (C-
WECS) in Worth County. As conceived, the project involved the construction and
operation of as many as fifty-five commercial wind turbines across approximately
100 parcels with the capacity to generate 165 megawatts of electricity.
Worthwhile was not actually going to construct and operate the energy system.
Instead, this was a “development-transfer” project. As a development-transfer
project, Worthwhile would complete the preliminary work, including conducting
studies and obtaining necessary regulatory approvals and permits, among other
things, so that it could sell the project to a third party who would then construct
and operate the turbines. Between 2018 and early 2021, Worthwhile undertook
3
these preliminary development activities. It commissioned environmental
screenings, engineering assessments, avian use studies, bat acoustic surveys,
sound and shadow flicker analyses, and other studies. It executed wind energy
leases with over 100 landowners. It filed an application with the Midcontinent
Independent System Operator (MISO), which manages the electrical grid and the
generator interconnection process, and posted approximately $3.8 million in
interconnection security deposits.
Although Worthwhile completed many preliminary activities in the
development of the project, the essential parameters of the project remained
unspecified and unstarted. Worthwhile had not selected a wind turbine model to
use in the development. It thus could not identify the nu
{# E23 (Nick, ruling section 1 answer 10): quoting a bill or a court opinion works
the way quoting a news article works. Select a passage above and the same panel
opens: the passage goes to the official you choose, with this document's own
address as its source and its own type. #}