Santacruz Silver Mining (TSXV:SCZ) - 'Undervalued?' Investment Series, with Art [12:48-15:42]
but being a being addressed. And when this becomes a normalized business, what that looks like. So you know, mining is tough. I get it. It's tough. You're putting out small fires every day figuratively. But how much longer of this kind of this normalization process before you can get to point me go, right, I'm going to have more line of sight to what production will look like. I will look, I can understand the margins, I can understand the the answers being pulled out of the ground. What do you think of we've got to store first this year from the perspective? Well, that's that's a very very good question, Matt. And let me break down normalization in two ways now. Normalization in terms of produce ounces. As we speak, we're increasing production both in Mexico and in Bolivia. In Mexico, we're increasing production because we are mining at level 960. So we're increasing tonnets throughput and we're increasing fed grades when compared to Q1 and and and Q4 last year. So an increase in production will come from achieving efficiencies in Mexico this year. And we'll start seeing those literally on Q2. And also you'll start seeing as well the all-in-sustained cash cost coming down at Synapan because we were investing a lot of capics into the mine and into the milling facility to get what we are today to achieve the efficiencies that we want at Synapan and to prepare the future of that mine at level 960. So in terms of production and and Synapan will will start delivering. In terms of cost, you will see as well as in improving its all-in-sustained cash cost as lower capics is required because the heavy lifting has been done already over the last five quarters. I mean last year and Q1 as well. And in Bolivia, we are going to be increasing our production at Bolivar mine mainly at Bolivar due to the watering process that the watering process is going well on its way and and we have a good handle, a good grip on the situation that can allow us to keep budgeting and meeting our objectives. So by the end of Q3, the Bolivar mine should be already the water beyond level 380 and at that moment that mine will be at full production silver-wise. I mean because the mine keeps producing sink because that unfortunately the two ways that were
{# E23 (Nick, ruling section 1 answer 10): quoting a bill or a court opinion works
the way quoting a news article works. Select a passage above and the same panel
opens: the passage goes to the official you choose, with this document's own
address as its source and its own type. #}