Bonin v. Sabine River Authority
── Bonin v. Sabine River Authority ──
Court: Court of Appeals for the Fifth Circuit
Date: May 07, 2026
Category: Civil Rights
Case: 25-40410 Document: 64-1 Page: 1 Date Filed: 05/07/2026
United States Court of Appeals
for the Fifth Circuit United States Court of Appeals
____________ Fifth Circuit
FILED
No. 25-40410 May 7, 2026
____________
Lyle W. Cayce
Clerk
Perry Bonin; Ace Chandler; Michael Manuel; Robert
Acreman; Jacqueline Acreman, Et al.,
Plaintiffs—Appellants,
versus
Sabine River Authority of Texas; Sabine River
Authority, State of Louisiana,
Defendants—Appellees.
______________________________
Appeal from the United States District Court
for the Eastern District of Texas
USDC No. 1:19-CV-527
______________________________
Before King, Southwick, and Haynes, Circuit Judges.
Leslie H. Southwick, Circuit Judge:
On March 9, 2016, in response to a record-breaking storm, the Toledo
Bend Dam opened nine of its eleven spillways into the Sabine River. The
Plaintiffs in this case, 700 downriver landowners flooded during the storm,
brought a takings claim against the operators of the dam and sought
compensation for damage done to their property by the high waters. The
Case: 25-40410 Document: 64-1 Page: 2 Date Filed: 05/07/2026
No. 25-40410
district court granted summary judgment for the Defendants. The Plaintiffs
timely appealed. We AFFIRM.
FACTUAL AND PROCEDURAL BACKGROUND
The course of the Sabine River demarcates more than half of the
border between Texas and Louisiana. Toledo Bend Dam, built as a
collaboration between Louisiana and Texas, restricts the Sabine, forming the
Toledo Bend Reservoir, the largest non-federal reservoir in the country.
Ryan M. Seidemann, Water and Power: The Sabine River Authority of
Louisiana, 25 TULANE ENV’T L.J. 389, 391 (2012). Two state entities
jointly manage the Toledo Bend Reservoir: the Sabine River Authority of
Texas (“SRA-T”) and the Sabine River Authority, State of Louisiana
(“SRA-L”). We will refer to them collectively as “the Authorities.”
Flowing south from the reservoir, the Sabine River eventually empties into
an estuary of the Gulf of Mexico.
SRA-T and SRA-L are co-licensed by the Federal Energy
Regulatory Commission (“FERC”) to operate and maintain the Toledo
Bend Hydroelectric Project, which includes the dam and spillways at issue in
this case. The two Authorities received their first license to construct,
operate, and maintain the Project in 1953. FERC issued a second license to
the Authorities in 2014.
In March 2016, Toledo Bend Reservoir suffered a period of intense
rainfall, with areas receiving between 20 and 25 inches of rain over a 31-hour
period. According to a post-incident report, the inflows of water into the
reservoir exceeded “the equivalent of a 500-year flood.” To avoid
“overtopping” of the dam, which can “ultimately lead to failure of the dam,”
the Authorities incrementally opened all nine operational spillways, releasing
water from the reservoir into the Sabine River. The spillways did not fully
2
Case: 25-40410 Document: 64-1 Page: 3 Date Filed: 05/07/2026
No. 25-40410
close until more than three weeks later. Flooding downriver of the dam
caused widespread damage in areas along the Sabine River.
The Plaintiffs, over seven hundred l
{# E23 (Nick, ruling section 1 answer 10): quoting a bill or a court opinion works
the way quoting a news article works. Select a passage above and the same panel
opens: the passage goes to the official you choose, with this document's own
address as its source and its own type. #}