Alternative and nuclear energy generation.
Alternative and nuclear energy generation. Requires: (1) a public utility to notify the Indiana utility regulatory commission (commission) of the public utility's intention to retire an electric generation facility not later than 18 months before the planned retirement date; and (2) the commission to conduct a study to determine the feasibility of using the location and infrastructure of the electric generation facility for development of alternative energy generation projects, including consideration of the suitability of the location and infrastructure for use in developing a nuclear energy facility.
← Back to Hunter Smith's profile
{# E23 (Nick, ruling section 1 answer 10): quoting a bill or a court opinion works
the way quoting a news article works. Select a passage above and the same panel
opens: the passage goes to the official you choose, with this document's own
address as its source and its own type. #}