Provides that in the design, construction, maintenance, or renovation of any transit facility, transportation facility, or equipment of the metropolitan transportation authority, work shall take place over a continuous period of time until such point at which the project has been completed.
Provides that in the design, construction, maintenance, or renovation of any transit facility, transportation facility, or equipment of the metropolitan transportation authority, work shall take place over a continuous period of time until such point at which the project has been completed.
← Back to Bill Weber's profile
{# E23 (Nick, ruling section 1 answer 10): quoting a bill or a court opinion works
the way quoting a news article works. Select a passage above and the same panel
opens: the passage goes to the official you choose, with this document's own
address as its source and its own type. #}