All States › New York › Herkimer County › Marianne Buttenschon › Evidence
Neutral Bill Mar 16, 2026

Relates to the installation of water monitoring systems at class C high hazard dams; provides requirements for the provision of information by water monitoring systems installed at certain dams about the water level and flood risk at such dams.

Relates to the installation of water monitoring systems at class C high hazard dams; provides requirements for the provision of information by water monitoring systems installed at certain dams about the water level and flood risk at such dams.

https://legiscan.com/NY/bill/A00681/2025
Bill data from LegiScan, used under CC BY 4.0.
Marianne Buttenschon Assemblymember
Share on X Share on Facebook
← Back to Marianne Buttenschon's profile
{# E23 (Nick, ruling section 1 answer 10): quoting a bill or a court opinion works the way quoting a news article works. Select a passage above and the same panel opens: the passage goes to the official you choose, with this document's own address as its source and its own type. #}